图书简介
The whaleback ship reflected the experiences of its inventor, Captain Alexander McDougall, who decided in the 1880s that he could build an improved and easily towed barge cheaply by using the relatively unskilled labor force available in his adopted hometown of Duluth, Minnesota. Captain McDougall’s dream resulted in the creation of the American Steel Barge Company. From 1888 to 1898, the American Steel Barge Company built and operated a fleet of forty-four barges and steamships on the Great Lakes and in international trade. These new ships were considered revolutionary by some and nautical curiosities by others. Built from what was then a high tech material (steel) and powered by state-of-the-art steam machinery, their creation in the remote north was a sign of industrial accomplishment.In "Whaleback Ships and the American Steel Barge Company", Roger C. Pellett explains that the construction of these ships and the industrial infrastructure required to build them was financed by a syndicate that included some of the major players active in the Golden Age of American capitalism. The American Steel Barge Company operated profitably from 1889 through 1892, each year adding new vessels to its growing fleet. By 1893, it had run out of cash. The cash crisis worsened with the onset of the Panic of 1893, which plunged the country into a depression that mostly halted the ship-building industry. Only one shareholder, John D. Rockefeller, was willing and able to invest in the company to keep it afloat, and by doing so he gained control. When prosperity returned in 1896, the interest in huge iron ore deposits on the Mesabe Range required larger, more efficient vessels. In an attempt to meet this need, the company built another vessel that incorporated many whaleback features but included a conventional Great Lakes steamship bow. Although this new steamship compared favorably with vessels of conventional design, it was the last vessel of whaleback design to be built."Whaleback Ships and the American Steel Barge Company" objectively examines the design of these ships using the original design drawings, notes the successes and failures of the company’s business strategy, and highlights the men at the operating level that attempted to make this strategy work. Readers interested in the maritime history of the Great Lakes and the industries that developed around them will find this book fascinating. (来源indiebound)
Trade Policy 买家须知
- 关于产品:
- ● 正版保障:本网站隶属于中国国际图书贸易集团公司,确保所有图书都是100%正版。
- ● 环保纸张:进口图书大多使用的都是环保轻型张,颜色偏黄,重量比较轻。
- ● 毛边版:即书翻页的地方,故意做成了参差不齐的样子,一般为精装版,更具收藏价值。
关于退换货:
- 由于预订产品的特殊性,采购订单正式发订后,买方不得无故取消全部或部分产品的订购。
- 由于进口图书的特殊性,发生以下情况的,请直接拒收货物,由快递返回:
- ● 外包装破损/发错货/少发货/图书外观破损/图书配件不全(例如:光盘等)
并请在工作日通过电话400-008-1110联系我们。
- 签收后,如发生以下情况,请在签收后的5个工作日内联系客服办理退换货:
- ● 缺页/错页/错印/脱线
关于发货时间:
- 一般情况下:
- ●【现货】 下单后48小时内由北京(库房)发出快递。
- ●【预订】【预售】下单后国外发货,到货时间预计5-8周左右,店铺默认中通快递,如需顺丰快递邮费到付。
- ● 需要开具发票的客户,发货时间可能在上述基础上再延后1-2个工作日(紧急发票需求,请联系010-68433105/3213);
- ● 如遇其他特殊原因,对发货时间有影响的,我们会第一时间在网站公告,敬请留意。
关于到货时间:
- 由于进口图书入境入库后,都是委托第三方快递发货,所以我们只能保证在规定时间内发出,但无法为您保证确切的到货时间。
- ● 主要城市一般2-4天
- ● 偏远地区一般4-7天
关于接听咨询电话的时间:
- 010-68433105/3213正常接听咨询电话的时间为:周一至周五上午8:30~下午5:00,周六、日及法定节假日休息,将无法接听来电,敬请谅解。
- 其它时间您也可以通过邮件联系我们:customer@readgo.cn,工作日会优先处理。
关于快递:
- ● 已付款订单:主要由中通、宅急送负责派送,订单进度查询请拨打010-68433105/3213。
本书暂无推荐
本书暂无推荐